Image from Google Jackets

Estimating the Impact of Restructuring on Electricity Generation Efficiency: The Case of the Indian Thermal Power Sector / Kabir Malik, Maureen Cropper, Alexander Limonov, Anoop Singh.

By: Contributor(s): Material type: TextTextSeries: Working Paper Series (National Bureau of Economic Research) ; no. w17383.Publication details: Cambridge, Mass. National Bureau of Economic Research 2011.Description: 1 online resource: illustrations (black and white)Subject(s): Online resources: Available additional physical forms:
  • Hardcopy version available to institutional subscribers
Abstract: We examine the impact of electricity sector restructuring on the operating efficiency of coal-fired power plants in India. Between 1995 and 2009, 85 percent of coal-based generation capacity owned by state governments was unbundled from vertically integrated State Electricity Boards into state generating companies. We find that generating units in states that unbundled before the Electricity Act of 2003 experienced reductions in forced outages of about 25% and improvements in availability of about 10%, with the largest results occurring 3-5 years after restructuring. We find no evidence of improvements in thermal efficiency at state-owned power plants due to reform.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Home library Collection Call number Status Date due Barcode Item holds
Working Paper Biblioteca Digital Colección NBER nber w17383 (Browse shelf(Opens below)) Not For Loan
Total holds: 0

September 2011.

We examine the impact of electricity sector restructuring on the operating efficiency of coal-fired power plants in India. Between 1995 and 2009, 85 percent of coal-based generation capacity owned by state governments was unbundled from vertically integrated State Electricity Boards into state generating companies. We find that generating units in states that unbundled before the Electricity Act of 2003 experienced reductions in forced outages of about 25% and improvements in availability of about 10%, with the largest results occurring 3-5 years after restructuring. We find no evidence of improvements in thermal efficiency at state-owned power plants due to reform.

Hardcopy version available to institutional subscribers

System requirements: Adobe [Acrobat] Reader required for PDF files.

Mode of access: World Wide Web.

Print version record

There are no comments on this title.

to post a comment.

Powered by Koha