Image from Google Jackets

Albania Priorities Report 2014 [electronic resource] / Organisation for Economic Co-operation and Development

By: Material type: ArticleArticleSeries: SIGMA Country Assessment Reports ; no.2014/13.Publication details: Paris : OECD Publishing, 2014.Description: 17 p. ; 21 x 29.7cmSubject(s): Online resources: Abstract: As a continuation of the 2014 SIGMA assessments and as part of a longer-term programme of work, SIGMA has identified country priorities for public administration reform (PAR) for Albania. Priorities cover the overall PAR needs of the country, including areas which were not covered by the 2014 SIGMA assessments. Priorities in areas outside the scope of SIGMA assessments are based on other analytical sources and SIGMA's practical experience of working with the country. SIGMA proposes priority 2020 targets for the countries, sub-targets when needed, and sequenced priority activities in 1-2, 3-5 and 5+ year time perspectives.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Home library Collection Call number Status Date due Barcode Item holds
Working Paper Biblioteca Digital Colección OECD OECD 5jm0xw4zzfvh-en (Browse shelf(Opens below)) Not For Loan
Total holds: 0

As a continuation of the 2014 SIGMA assessments and as part of a longer-term programme of work, SIGMA has identified country priorities for public administration reform (PAR) for Albania. Priorities cover the overall PAR needs of the country, including areas which were not covered by the 2014 SIGMA assessments. Priorities in areas outside the scope of SIGMA assessments are based on other analytical sources and SIGMA's practical experience of working with the country. SIGMA proposes priority 2020 targets for the countries, sub-targets when needed, and sequenced priority activities in 1-2, 3-5 and 5+ year time perspectives.

There are no comments on this title.

to post a comment.

Powered by Koha